Dawson Creek and District Hospital Replacement – Dawson Creek, BC

Share Dawson Creek and District Hospital Replacement – Dawson Creek, BC on Facebook Share Dawson Creek and District Hospital Replacement – Dawson Creek, BC on Twitter Share Dawson Creek and District Hospital Replacement – Dawson Creek, BC on Linkedin Email Dawson Creek and District Hospital Replacement – Dawson Creek, BC link

Project Overview

We are building a new, state-of-the-art hospital to address current and future health and patient care needs.

The vision of the project is to create a model of excellence in health care that will incorporate modern best practices and standards for the hospital, as well as meet the future needs of the region.

The new hospital will improve the healing environment and provide culturally safe care for residents of the Northeast. It will benefit patients, families, physicians and staff through strengthened existing services. The project will support recruitment, retention, and

Project Overview

We are building a new, state-of-the-art hospital to address current and future health and patient care needs.

The vision of the project is to create a model of excellence in health care that will incorporate modern best practices and standards for the hospital, as well as meet the future needs of the region.

The new hospital will improve the healing environment and provide culturally safe care for residents of the Northeast. It will benefit patients, families, physicians and staff through strengthened existing services. The project will support recruitment, retention, and engagement of health care workers and bring local economic benefits to the City of Dawson Creek, surrounding areas, and local Indigenous communities.

The new hospital will be over 50% bigger than the current hospital (approx. 24,500m2 / 263,000ft²) and will include:

  • 24 additional beds, bringing the total up to 70 beds, all of which will be single rooms with ensuite washrooms.

  • An emergency department that is double the size of the existing one, with a treatment spaces increasing from 10 to 15.

  • Support for new moms and families through a maternity unit including labour, delivery, recovery and post-partum rooms and a nursery.

  • Improved mental health service delivery with an increase of beds from 15 to 18, plus 2 high observation rooms.

  • Space for a laboratory, medical imaging, and physical rehabilitation.

  • A range of surgical services as well as ambulatory care including cancer care, IV therapy, respiratory therapy, and visiting specialists.

  • A spiritual room for use by people of all faiths and cultures that can accommodate cultural ceremonies such as smudging.

  • Improved regional pharmacy services that meet the new National Association of Pharmacy Regulatory Authorities guidelines and requirements.

  • Culturally safe and welcoming spaces that are designed with input and feedback from surrounding Indigenous communities as well as the local community.

  • Increased parking capacity with over 290 parking stalls for patients, visitors, and staff.

The new Dawson Creek & District Hospital is being built in Treaty 8 territory, the ancestral home of the Beaver, Cree, Saulteau, Sicannie (Sikanni), and Slavey. Northern Health acknowledges the hospital serves the communities of Blueberry River First Nation, Doig River First Nation, Fort Nelson First Nation, Halfway River First Nation, Kelly Lake Communities, Prophet River First Nation, Saulteau First Nations, and West Moberly First Nations; as well as Métis, Inuit, and urban Indigenous populations within the Peace Region of Treaty 8 territory.

The budget for the project is approximately $590 million which will be shared by the provincial government, through Northern Health, and the Peace River Regional Hospital District.

  • Peace River Regional District implementing a proactive tax adjustment to support the DCDH replacement project

    Share Peace River Regional District implementing a proactive tax adjustment to support the DCDH replacement project on Facebook Share Peace River Regional District implementing a proactive tax adjustment to support the DCDH replacement project on Twitter Share Peace River Regional District implementing a proactive tax adjustment to support the DCDH replacement project on Linkedin Email Peace River Regional District implementing a proactive tax adjustment to support the DCDH replacement project link
    supporting image

    You need to be signed in to add your comment.

  • Working groups provide valuable input

    Share Working groups provide valuable input on Facebook Share Working groups provide valuable input on Twitter Share Working groups provide valuable input on Linkedin Email Working groups provide valuable input link
    supporting image

    Northern Health is committed to receiving valuable input into design aspects of the new hospital through a mix of engagement initiatives, user consultations, committees and working groups. Engagement is a major part of Northern Health capital projects, and there will be many opportunities for input from the community as this project progresses.

    The Dawson Creek and District Hospital (DCDH) Replacement Project has been supported by a Capital Advisory Committee (CAC) since October 2020. The CAC has representation from the local community, stakeholders and Indigenous representatives, and has provided guidance in relation to the project.

    We have recently formed two additional sub-working groups to serve under the CAC and provide feedback and input into the design of the new hospital. The two new working groups are the Community Advisory Working Group (CAWG) and the Indigenous Advisory Working Group (IAWG). The purpose of these groups is to have a forum for members to provide input into design aspects of the project to ensure the new facility is locally and culturally safe, welcoming, respectful and relevant. The working groups inform the project to help ensure the facility reflects and supports the communities served by the Dawson Creek & District Hospital. Input and feedback gathered from all of these committees and groups is extremely valuable and we are tremendously grateful for the participation of the members.

    Read the April 2023 Project Update to view the current CAWG and IAWG membership lists.

    Feedback and input gathered from the working groups is filtered upwards. It first goes to the CAC, then it goes to the Project Steering Committee who, in collaboration with the Project Board, balances the complexities of a capital building project.

    In addition to the CAC, IAWG, and CAWG, the project team works closely with small groups of “users” who represent their areas of expertise to gather feedback and input from a clinical point of view. The users work with the Design-Builder during User Consultation Meetings (UCM) and Special Topic Meetings (STM) to help them better understand over-arching concepts, ensure that all departments are situations correctly for the best clinical care and efficiencies and advise on standard operational best practices. Feedback and input gathered from the users is taken back to the Design-Builder for consideration and incorporation.

    You need to be signed in to add your comment.

  • Project Timeline

    Share Project Timeline on Facebook Share Project Timeline on Twitter Share Project Timeline on Linkedin Email Project Timeline link
    supporting image

  • A Project Update: January 2023

    Share A Project Update: January 2023 on Facebook Share A Project Update: January 2023 on Twitter Share A Project Update: January 2023 on Linkedin Email A Project Update: January 2023 link
    supporting image

    Project status update

    Where we’re at

    The project is now moving to the next step in the procurement process with the issuance of a new Request for Proposals (RFP). The Government of British Columbia and Northern Health have decided to end the Design Early Works Agreement (DEWA) and Request for Proposals (RFP) with Clark Turner Dawson Creek JV.

    Throughout the new RFP process, HDR Architecture will be available to serve as the design firm for any interested proponent. Design work completed to date will still be used for the project as design continues to advance.

    We’ve recently received the 60% design submission from HDR Architecture and are in the process of reviewing it and providing feedback. This feedback will be shared with the proponent teams to be incorporated into the design.

    This month, we will be submitting a Stage 1 Building Permit to the City of Dawson Creek for their review. This will allow the selected proponent to begin early site construction work in the spring.

    What’s next

    We’re now working towards selecting a new proponent to complete and deliver the project. Over the coming months, we will be working collaboratively with the new proponent teams to review the project’s requirements and the recently submitted 60% design. There will be a series of collaborative meetings to help them understand the project and answer any questions before a final decision is made.

    We’re also working closely with HDR Architecture to provide feedback on the 60% design submission. This feedback along with the proponents’ feedback will be incorporated into an updated set of project requirements.

    In the spring, the proponent teams will submit their financial submissions for evaluation. Following the evaluation, we anticipate announcing the new preferred proponent and signing the Design Build Agreement (DBA). Once the DBA is signed, construction will begin shortly after. The final design work will also be starting which will include another round of user consultation meetings in the summer and a third round of mock-ups on site.

    Engagement activities

    DCDH Foundation: Donor Appreciation Reception

    In November, the Dawson Creek and District Hospital Foundation held a Donor Appreciation Reception at Our Social Collective, a local co-working space in downtown Dawson Creek, which the Project Management Office (PMO) was happy to support.

    Approximately forty donors, community leaders and stakeholders joined members of the Foundation Board of Directors in an afternoon to celebrate the generosity of the community and meet the new Foundation Executive Director.


    Those in attendance were treated to a presentation about the Dawson Creek & District Hospital Replacement Project from the project’s Community Engagement Liaison Officer, Ashley Pannozzo, and Northern Health Vice President, Communications & Public Relations, Steve Raper. The guests were very involved with the conversation and asked pertinent and insightful questions.

    The DCDH Foundation’s Executive Director, Heather Kohler says “The Foundation was delighted to partner with Northern Health for this event which provided the opportunity for some of our most committed donors to engage with Northern Health in a valuable face-to-face setting.”

    Community and Indigenous Advisory Working Groups

    In December, we reached out to local community stakeholders, Indigenous communities and other interested and impacted parties to invite them to join the Community and/or Indigenous Advisory Working Groups. The purpose of these working groups is to give the members an opportunity to provide feedback and share their input into the hospital design to ensure that the new facility is welcoming, relevant and respectful.

    Input gathered from these working groups goes to the Capital Advisory Committee (CAC) and then to the Steering Committee. The Steering Committee works in collaboration with the Project Board to examine the feedback and determine how to incorporate it into the project as appropriate.

    Collectively, the working groups will have the opportunity to provide advice relating to the project on local and community considerations, patient experiences, relevant and welcoming design, artwork and signage, and other areas of interest.

    For more information

    Dawson Creek and District Hospital Let’s Talk

    Let’s Talk is our one-stop shop for updates related to the Dawson Creek and District Hospital Replacement Project as well as contact us with questions or suggestions on the project.

    Dawson Creek and District Hospital Let’s Talk

    Contact us directly

    For questions, feedback, or to get added to the distribution list for these updates, feel free to reach out directly to Ashley Pannozzo, our Community Engagement Liaison Officer, for the Dawson Creek and District Hospital Replacement Project at LetsTalkDCDH@northernhealth.ca.

    You need to be signed in to add your comment.

  • Join the DCDH Indigenous Working Group

    Share Join the DCDH Indigenous Working Group on Facebook Share Join the DCDH Indigenous Working Group on Twitter Share Join the DCDH Indigenous Working Group on Linkedin Email Join the DCDH Indigenous Working Group link
    supporting image

    APPLICATIONS ARE NOW CLOSED.

    Apply for the Indigenous Working Group here: Member, Indigenous Working Group, Dawson Creek Hospital Replacement Project - Patient Voices Network (patientvoicesbc.ca)

    The deadline to apply is January 20, 2023.

    We're building a new, state-of-the-art hospital in Dawson Creek and are looking for two patient partners and/or community representatives to join the Indigenous Working Group. If you would like to provide input into the design of the new hospital, this could be the opportunity for you!

    The purpose of this working group is for community members and patient partners to provide feedback and share their input into the hospital design to ensure that the new facility in Dawson Creek is culturally safe, respectful, welcoming, and relevant.

    We respect, value and seek an opportunity to engage with Indigenous patient partners in the spirit of reciprocity. It is with humbleness and humility that we recognize and value the importance of understanding how the hospital replacement project can meet the needs of Indigenous patients and their families.

    This opportunity is at the level of involve on the spectrum of engagement. The promise to you is that the health care partner will involve patients in planning and design phases to ensure ideas or concerns are considered and reflected in alternatives and recommendations.

    Eligibility

    Open to Indigenous patient partners and community members from Dawson Creek, Chetwynd and/or Tumbler Ridge and surrounding areas who:

    • Have experience of accessing health care services at Dawson Creek and District Hospital (DCDH) within the last 12 months
    • Previous working group experience is an asset but not required
    • Are comfortable sharing experiences in a group environment
    • Are comfortable attending online meetings via Zoom or MS Teams

    As connection and relationship building is important to Northern Health, informal meet & greets will form part of the selection process for short listed patient partners/community members.

    Logistics

    • Number of vacancies: 2-3
    • Date and Time:
      • The first meeting of the Indigenous Working Group is scheduled for February 2023 – exact date TBD.
      • Meetings will occur on a quarterly basis (every 3 months) and will last for approximately 1 hour.
      • We anticipate having meetings in February, May, August, and November.
      • There may be times when an ad hoc meeting is required based on needs and short deadlines from the project team
    • Location: Online meetings via Zoom or MS Teams, with the possibility of in-person meetings
    • Commitment: 12 months with the possibility of an extension

    Reimbursement
    No out of pocket expenses are anticipated for this engagement opportunity. However, if you meet the eligibility criteria, but have concerns about your ability to participate, please contact Cassy Mitchell cmitchell@bcpsqc.ca to see if support options are available. We are always seeking to better understand and reduce barriers to participation.

    If travel is required to attend any in-person meetings, then travel related costs such as mileage will be reimbursed as per Northern Health’s travel reimbursement policy.

    Background
    Approximately 15-20 representatives from local organizations and groups will be part of this working group. This includes the Treaty 8 First Nations, Nawican Friendship Centre, Aboriginal Family Services, Northern Health Indigenous Health, Northeast Metis Association, Moccasin Flats Metis Association North Wind Wellness Centre and more.

    The Indigenous Working Group will work in conjunction with the DCDH Community Working Group, which is also in the process of being formed.

    Sub-groups with members from both of these groups may be formed to focus on specific topics such as artwork, language, wayfinding, etc.

    Our aim is for the group to have a wide range of representatives who have different experiences and access health care in unique ways.

    The Terms of Reference for the Indigenous Working Group will be posted on the DCDH Replacement Let’s Talk website when they are finalized.

    You need to be signed in to add your comment.

  • Join the DCDH Community Working Group

    Share Join the DCDH Community Working Group on Facebook Share Join the DCDH Community Working Group on Twitter Share Join the DCDH Community Working Group on Linkedin Email Join the DCDH Community Working Group link
    supporting image

    APPLICATIONS ARE NOW CLOSED.

    Apply for the Community Working Group here: Member, Community Working Group, Dawson Creek Hospital Replacement Project - Patient Voices Network (patientvoicesbc.ca)

    The deadline to apply is January 20, 2023.

    We're building a new, state-of-the-art hospital in Dawson Creek and are looking for two patient partners and/or community representatives to join the Community Working Group. If you would like to provide input into the design of the new hospital, this could be the opportunity for you!

    The purpose of this working group is for community members and stakeholders – including patients – to provide feedback and share their input into the hospital design to ensure that the new facility in Dawson Creek is welcoming, relevant and respectful.

    This opportunity is at the level of involve on the spectrum of engagement. The promise to you is that the health care partner will involve patients in planning and design phases to ensure ideas or concerns are considered and reflected in alternatives and recommendations.

    Eligibility

    Open to patient partners and community members from Dawson Creek, Chetwynd and/or Tumbler Ridge who:

    • Have experience of accessing health care services at Dawson Creek and District Hospital (DCDH) within the last 12 months
    • Previous working group experience is an asset but not required
    • Are comfortable sharing experiences in a group environment
    • Are comfortable attending online meetings via Zoom or MS Teams

    Connection and relationship building is important to us so informal meet & greets will be part of the selection process for short listed patient partners/community members.

    Logistics

    • Number of vacancies: 2-3
    • Date and Time:
      • The first meeting of the Community Working Group is scheduled for February 2023 – exact date TBD.
      • Meetings will occur on a quarterly basis (every 3 months) and will last for approximately 1 hour.
      • We anticipate having meetings in February, May, August, and November.
      • There may be times when an ad hoc meeting is required based on needs and short deadlines from the project team
    • Location: Online meetings via Zoom or MS Teams, with the possibility of in-person meetings
    • Commitment: 12 months with the possibility of an extension

    Reimbursement
    No out of pocket expenses are anticipated for this engagement opportunity. However, if you meet the eligibility criteria, but have concerns about your ability to participate, please contact Cassy Mitchell cmitchell@bcpsqc.ca to see if support options are available. We are always seeking to better understand and reduce barriers to participation.

    If travel is required to attend any in-person meetings then travel related costs such as mileage will be reimbursed as per Northern Health’s travel reimbursement policy.

    Background
    Approximately 15-20 representatives from local organizations and groups will be part of this working group.

    This DCDH Community Working Group will work in conjunction with the DCDH Indigenous Working Group, which is also in the process of being formed.

    Sub-groups with members from both of these groups may be formed to focus on specific topics such as artwork, language, wayfinding, etc.

    Our aim is for the group to have a wide range of representatives who have different experiences and access health care in unique ways.

    The Terms of Reference for the Community Working Group will be posted on the DCDH Replacement Let’s Talk website when they are finalized.

    You need to be signed in to add your comment.

  • Dawson Creek and District Hospital Replacement moves to next step in procurement process

    Share Dawson Creek and District Hospital Replacement moves to next step in procurement process on Facebook Share Dawson Creek and District Hospital Replacement moves to next step in procurement process on Twitter Share Dawson Creek and District Hospital Replacement moves to next step in procurement process on Linkedin Email Dawson Creek and District Hospital Replacement moves to next step in procurement process link
    supporting image

    The Government of British Columbia and Northern Health are moving to the next step in the procurement process for replacement of the Dawson Creek and District Hospital.

    The design of the new state-the-art hospital is approximately 60% complete and continuing to advance; however, Northern Health was unable to reach an agreement with the previously selected builder. As a result, a request for proposals will be issued in mid-January 2023 to select a proponent to complete and deliver the project.

    The new proponent is expected to be selected early in 2023, with construction to begin shortly after.

    The new hospital will be on the territory of Treaty 8 First Nations. Local First Nations will be consulted throughout the project to ensure culturally appropriate spaces are available, which will include a non-denominational spiritual room for use by people of all cultures and faiths.

    The new facility will provide a range of surgical services, as well as chemotherapy, ambulatory care, radiology, clinical support and pharmacy services. There will also be space for a laboratory and diagnostic imaging, and a perinatal unit, including labour, delivery, recovery and post-partum rooms, as well as a nursery to support new parents and families.

    The project is funded by the provincial government, through Northern Health, and the Peace River Regional Hospital District.

    The new hospital is expected to be ready for patients in 2027. The existing hospital will remain operational during the construction of the new hospital.

    Quick Facts:

    • The new building will be approximately 19,400 square metres (209,000 square feet) and have 70 beds, which is an increase of 24 beds.
    • Mental-health service delivery will be brought up to modern standards with a new in-patient suite and an increase of beds from 15 to 18.
    • The emergency department will increase in size, with treatment spaces increasing from 10 to 15.

    Read the full BC Gov News release: Dawson Creek hospital replacement moves to next step in procurement process

    You need to be signed in to add your comment.

  • Slowing down for the holidays...

    Share Slowing down for the holidays... on Facebook Share Slowing down for the holidays... on Twitter Share Slowing down for the holidays... on Linkedin Email Slowing down for the holidays... link
    supporting image

    As we get closer to the holiday season, our team members will be taking some much-needed vacation time after a busy year to spend time with their families and re-charge for the new year.

    We hope that you all have a very merry holiday season and a happy new year!

    Stay tuned for more updates about the Dawson Creek and District Hospital Replacement Project in 2023!

    You need to be signed in to add your comment.

  • DCDH Foundation's Donor Appreciation Event

    Share DCDH Foundation's Donor Appreciation Event on Facebook Share DCDH Foundation's Donor Appreciation Event on Twitter Share DCDH Foundation's Donor Appreciation Event on Linkedin Email DCDH Foundation's Donor Appreciation Event link
    supporting image

    On November 25, the Dawson Creek and District Hospital Foundation held a Donor Appreciation Reception at Our Social Collective, a local co-working space in downtown Dawson Creek, which the Project Management Office (PMO) was happy to support.

    Approximately forty donors, community leaders and stakeholders joined members of the Foundation Board of Directors in an afternoon to celebrate the generosity of the community and meet the new Foundation Executive Director.

    Those in attendance were treated to a presentation about the Dawson Creek & District Hospital Replacement Project from the project’s Community Engagement Liaison Officer, Ashley Pannozzo, and Northern Health Vice President, Communications & Public Relations, Steve Raper. The guests were very involved with the conversation and asked pertinent and insightful questions.

    The DCDH Foundation’s Executive Director, Heather Kohler says “The Foundation was delighted to partner with Northern Health for this event which provided the opportunity for some of our most committed donors to engage with Northern Health in a valuable face-to-face setting.”

    You need to be signed in to add your comment.

  • What's inside the Quonset hut?

    Share What's inside the Quonset hut? on Facebook Share What's inside the Quonset hut? on Twitter Share What's inside the Quonset hut? on Linkedin Email What's inside the Quonset hut? link
    supporting image

    In mid-October, a mysterious 120’ long by 72’ wide white Quonset hut appeared on the Southwest corner of the current hospital’s property.

    We’ve heard a lot of theories about what’s inside the hut… ranging from a storage shed, to a greenhouse, to the set for the next Dexter sequel, to showrooms, to a laboratory. We can confirm that only one of those theories is somewhat accurate and it is showrooms.

    Although, the Quonset hut isn’t exactly a traditional showroom as you would think, with brand new shiny pieces of medical equipment and an exact replica of the entire new hospital inside. But – it is constructed rooms with life-size replicas and mock-ups of key areas of the new hospital that we are showing to select groups.

    Now you might be wondering, what’s the purpose of installing the Quonset hut? Well, it’s a key component of the ongoing design process and will remain in place until 100% of the design is complete.

    Who is able to access the Quonset hut? Only select groups of physicians and health care staff are able to access the hut, which we refer to as “the users”. The users represent their areas of expertise and are selected or appointed to participate in the ongoing design process. The Quonset hut is not open to the public. We understand that you are curious to see what the design of the new hospital will look like. We can assure you that when we’re able to share more details about the design with the public, we will. Stay tuned!

    How does the ongoing design process work? It’s broken down into four phases – the 30%, 60%, 95% and 100% design submissions. In September, we received and reviewed the 30% design submission from the Design-Builder. Prior to approving the submission, the Design-Builder delivered the first mock-up in a virtual format with 3D drawings of key areas to help the users visualize features of the rooms and provide relevant feedback. We are now progressing towards the 60% design submission.

    On November 14 and 15, the users were guided through the hut for the second series of mock-ups to experience certain design features of each room. The users’ feedback will be incorporated in the 60% design submission.

    This mock-up has fully constructed walls with 1:1 prints of elements of the room covering the walls and floors – such as millwork, services, furniture and equipment, IMIT device locations, and power and data receptacle locations.

    The rooms included in the second mock-up are:

    • Labour, delivery, recovery and post-partum room
    • Nursing station
    • Medication room
    • Soiled utility room
    • Exam room
    • Emergency – Resuscitation/trauma room
    • Emergency – Exam/treatment room
    • Medical in-patient bedroom and washroom
    • Typical patient room
    • In-patient bariatric room
    • Isolation room
    • Anteroom

    The next step in the ongoing design process is the Design-Builder submitting the 60% design submission with feedback from recent User Consultation Meetings and the second mock-up being incorporated. When the project team reviews the 60% design submission, the Design-Builder will begin working towards the 95% design submission.

    During the next design phase (60-95%), a third mock-up will be constructed inside the Quonset hut which will build on details from the second and include actual materials and finishes.

    You need to be signed in to add your comment.

Page last updated: 24 Nov 2025, 10:12 AM