Dawson Creek and District Hospital Replacement – Dawson Creek, BC

Share Dawson Creek and District Hospital Replacement – Dawson Creek, BC on Facebook Share Dawson Creek and District Hospital Replacement – Dawson Creek, BC on Twitter Share Dawson Creek and District Hospital Replacement – Dawson Creek, BC on Linkedin Email Dawson Creek and District Hospital Replacement – Dawson Creek, BC link

Project Overview

We are building a new, state-of-the-art hospital in Dawson Creek to address current and future health and patient care needs.

The vision of the Dawson Creek & District Hospital (DCDH) Replacement Project is to create a model of excellence in health care that will incorporate modern best practices and standards for the hospital, as well as meet the future needs of the region.

The new hospital will improve the healing environment and provide culturally safe care for residents of the Northeast. It will benefit patients, families, physicians and staff through strengthened existing

Project Overview

We are building a new, state-of-the-art hospital in Dawson Creek to address current and future health and patient care needs.

The vision of the Dawson Creek & District Hospital (DCDH) Replacement Project is to create a model of excellence in health care that will incorporate modern best practices and standards for the hospital, as well as meet the future needs of the region.

The new hospital will improve the healing environment and provide culturally safe care for residents of the Northeast. It will benefit patients, families, physicians and staff through strengthened existing services. The project will support recruitment, retention, and engagement of health care workers and bring local economic benefits to the City of Dawson Creek, surrounding areas, and local Indigenous communities.

The new hospital will be approximately 24,500 square metres (263,000 square feet) and will include:

  • 24 additional beds, bringing the total up to 70 beds, all of which will be single rooms with ensuite washrooms.

  • An emergency department that is double the size of the existing one, with a treatment spaces increasing from 10 to 15.

  • Support for new moms and families through a perinatal unit including labour, delivery, recovery and post-partum rooms and a nursery.

  • Improved mental health service delivery with a new in-patient suite and an increase of beds from 15 to 18 plus two high observation rooms.

  • Space for a laboratory, medical imaging, and physical rehabilitation.

  • A range of surgical services as well as ambulatory care including cancer care, IV therapy, respiratory therapy, and visiting specialists.

  • A spiritual room for use by people of all faiths and cultures that can accommodate cultural ceremonies such as smudging.

  • Improved regional pharmacy services that meet the new National Association of Pharmacy Regulatory Authorities guidelines and requirements.

  • Culturally safe and welcoming spaces that are designed with input and feedback from surrounding Indigenous communities as well as the local community.

  • Increased parking capacity with over 300 parking stalls for patients, visitors, and staff.

The new DCDH is being built in Treaty 8 territory, the ancestral home of the Beaver, Cree, Saulteau, Sicannie (Sikanni), and Slavey.

Northern Health acknowledges the hospital serves the communities of Blueberry River First Nation, Doig River First Nation, Fort Nelson First Nation, Halfway River First Nation, Kelly Lake Communities, Prophet River First Nation, Saulteau First Nations, and West Moberly First Nations; as well as Métis, Inuit, and urban Indigenous populations within the Peace Region of Treaty 8 territory.

The budget for the project is approximately $590 million which will be shared by the provincial government, through Northern Health, and the Peace River Regional Hospital District.

  • Lots of progress being made

    Share Lots of progress being made on Facebook Share Lots of progress being made on Twitter Share Lots of progress being made on Linkedin Email Lots of progress being made link
    supporting image

    There has been a lot of work underway and progress made on the site of the new hospital! The topsoil has been striped and bulk excavation has started from East to West. We anticipate bulk excavation being completed within the next couple of weeks. To the end of July, a total of 12,000m3 of material has been excavated and removed from the site.


    You need to be signed in to add your comment.

  • Thank you to all of our partners!

    Share Thank you to all of our partners! on Facebook Share Thank you to all of our partners! on Twitter Share Thank you to all of our partners! on Linkedin Email Thank you to all of our partners! link
    supporting image

    We thank and appreciate all of our partners who have helped make the new Dawson Creek & District Hospital a reality.

    Logos included on the sign were received at time of print. We appreciate all of our partners whether they are or are not included on the sign.

    From left to right, top to bottom: Blueberry River First Nations, Doig River First Nation, First Nations Health Authority, Fort Nelson First Nation, Halfway River First Nation, communities of Kelly Lake, Métis Nation British Columbia, Prophet River First Nation, Saulteau First Nations, Treaty 8 Tribal Association, West Moberly First Nations, BC Patient Safety & Quality Council/Patient Voices Network, City of Dawson Creek, Dawson Creek & District Hospital Foundation, District of Chetwynd, District of Tumbler Ridge, Graham Design Builders, HDR Architecture, Infrastructure BC, Northern Health, Northern Lights College, Peace River Regional District, South Peace Health Services Society.

    You need to be signed in to add your comment.

  • Bulk excavation and increased truck traffic

    Share Bulk excavation and increased truck traffic on Facebook Share Bulk excavation and increased truck traffic on Twitter Share Bulk excavation and increased truck traffic on Linkedin Email Bulk excavation and increased truck traffic link
    supporting image

    There has been an increase in truck traffic on and around the site due to bulk excavation for the hospital basement starting. Excavation will continue for the next 4-5 weeks. Trucks will be entering the site from 112 Ave and exiting the site from 12 St.

    Fun fact: Currently, approximately 12 trucks are entering and exiting the site per hour and removing approximately 1800m³ of material per day! In the next week, this will increase to approximately 20 trucks per hour removing up to 2500m³ of material per day. Once bulk excavation is complete, approximately 56,000m³ of material will have been removed from the site.


    You need to be signed in to add your comment.

  • Renderings: Public Interior Spaces

    Share Renderings: Public Interior Spaces on Facebook Share Renderings: Public Interior Spaces on Twitter Share Renderings: Public Interior Spaces on Linkedin Email Renderings: Public Interior Spaces link
    supporting image

    Please note: Renderings are from the last design submission and are approximate and subject to change at any time. They are simulated views and information depicted is illustrative. The Design Builder makes no guarantee that what is depicted will ultimately appear as shown in the final design and construction.

    Registration kiosksPublic seating and waiting area by the main entrance View from main entrance down elevator corridor Public seating and waiting areas Entrance to non-denominational spiritual room with nook in wall for artwork and artefacts
    View down hallway to main entrance with display case for artwork and artefactsDiagnostic imaging reception Public seating and waiting area

    Emergency department waiting area

    Inside the non-denominational spiritual room

    Level 0 elevator lobby with display case for artwork and artefacts

    Level 1 elevator lobby with display case for artwork and artefacts

    Level 2 elevator lobby with display case for artwork and artefacts
    Level 3 elevator lobby with display case for artwork and artefacts



    You need to be signed in to add your comment.

  • Renderings: Patient Rooms

    Share Renderings: Patient Rooms on Facebook Share Renderings: Patient Rooms on Twitter Share Renderings: Patient Rooms on Linkedin Email Renderings: Patient Rooms link
    supporting image

    Please note: Renderings are from the last design submission and are approximate and subject to change at any time. They are simulated views and information depicted is illustrative. The Design Builder makes no guarantee that what is depicted will ultimately appear as shown in the final design and construction.

    Typical in-patient roomTypical in-patient room footwallTypical bariatric roomTypical bariatric room footwallTypical labour, delivery, recover and post-partum (LDRP) room

    Typical labour, delivery, recover and post-partum (LDRP) room footwall

    Typical isolation room
    Typical isolation room footwall


    You need to be signed in to add your comment.

  • Site plan

    Share Site plan on Facebook Share Site plan on Twitter Share Site plan on Linkedin Email Site plan link
    supporting image


    Please note: The site plan is approximate and subject to change at any time. All renderings are simulated views and information depicted is illustrative. The Design Builder makes no guarantee that what is depicted will ultimately appear as shown in the final design and construction. Plant species illustrated may not be representative of the final species or maturity of the plants selected during the detailed design stage.


    You need to be signed in to add your comment.

  • Celebration for staff

    Share Celebration for staff on Facebook Share Celebration for staff on Twitter Share Celebration for staff on Linkedin Email Celebration for staff link
    supporting image

    The Project Management Office hosted a celebration for DCDH and Health Unit staff to celebrate the start of construction on the new hospital. Everyone was invited down to meet the project team, view draft renderings of the new hospital, and enjoy cupcakes from Co-op Bakery and charcuterie boards from beans&barley.

    We appreciate all of our staff for the hard work they do on a daily basis and for sharing their thoughts on the project during user consultation meetings. It's important that their voices are heard as we design and construct the new facility that they will eventually work in and provide healthcare services to patients and the community.

    You need to be signed in to add your comment.

  • Constructing care: Chamber luncheon with Graham Design Builders

    Share Constructing care: Chamber luncheon with Graham Design Builders on Facebook Share Constructing care: Chamber luncheon with Graham Design Builders on Twitter Share Constructing care: Chamber luncheon with Graham Design Builders on Linkedin Email Constructing care: Chamber luncheon with Graham Design Builders link
    supporting image

    On July 19, the Dawson Creek Chamber of Commerce hosted a luncheon with their members under the theme "Constructing Care with Graham Design Builders".

    Business leaders, community members, and local stakeholders gathered at the George Dawson Inn to hear from Dave Corcoran, Project Director, Graham Design Builders about the new Dawson Creek and District Hospital.

    Dave presented a project overview and update, shared information about what's next, discussed the construction process and plans, and the positive impact it will have on the community.

    The members also learned about upcoming subcontract and business opportunities with the project. You can read the full list of upcoming opportunities here.

    You need to be signed in to add your comment.

  • Shovels in the ground!

    Share Shovels in the ground! on Facebook Share Shovels in the ground! on Twitter Share Shovels in the ground! on Linkedin Email Shovels in the ground! link
    supporting image

    It's official! Ground has been broken on the site of the new hospital. A small group gathered yesterday to dig the ceremonial hole and celebrate the start of construction, although they had a bit of help from the excavator.

    Pictured from left to right: Bart DeVries (DCDH PMO), Kate Kustak (DCDH Foundation), Deb Taylor (DCDH PMO), Brette Madden (DCDH Foundation), John Kurjata (Northern Health Board of Directors), Maciej Paszkowski (Graham), Mayor Darcy Dober (City of Dawson Creek), Richard Bygrave (DCDH PMO), Director Leonard Hiebert (PRRHD), Nathan Salomon (DCDH PMO), Kendra Kiss (Northern Health), Dave Corcoran (Graham), Fern Hansen (DCDH Auxiliary), Margaret McGillis (Northern Health), Jennifer Dunn (DCDH PMO), Ramona Daly (DCDH PMO), and Ashley Pannozzo (DCDH PMO).

    You need to be signed in to add your comment.

  • Fencing and site office

    Share Fencing and site office on Facebook Share Fencing and site office on Twitter Share Fencing and site office on Linkedin Email Fencing and site office link
    supporting image

    Over the last couple of days, perimeter fencing has been installed and the site office trailers and some pieces of equipment have arrived on-site.

    You need to be signed in to add your comment.

Page last updated: 26 Apr 2024, 12:43 PM