-
A Project Update: January 2024
Share A Project Update: January 2024 on Facebook Share A Project Update: January 2024 on Twitter Share A Project Update: January 2024 on Linkedin Email A Project Update: January 2024 linkProject status update
Where we’re at
Since our last update, work has been progressing well on the site of the new hospital – partially thanks to the mild weather we had heading into the holiday season!
During October, detailed excavation was completed and over 2,200m3 (about the volume of an Olympic-size swimming pool) of concrete was poured.
During November, construction activities transitioned to vertical components such as elevator cores, columns, and foundation walls. The second tower crane was also installed – check out this timelapse video of the process.
During December, work began on foundation walls, interior columns, gas and electrical set up for site heating, and backfill of deep foundations.
In addition, Graham prepared for the winter months by implementing their frost protection, ground heating and new temperature monitoring systems.
What’s next
Over the coming months, construction activities will continue to focus on the concrete superstructure and work has just begun on the level 1 structural suspended slab.
In March, we will receive and review the formal 95% design submission and host the third round of mock-ups in the Quonset hut.
Engagement initiatives
Display at NLC’s Open House
On Saturday, November 4, Northern Lights College hosted an Open House for community members to tour the campus and learn about their programs.
Attendees were able to learn about the project as well as current and upcoming employment opportunities at DCDH and across the Northern Health region.
Other exciting news
Employment opportunities
Start your journey with Northern Health at the newest hospital in the Northeast! There are a number of positions that need to be filled at the current and future hospital ranging from clinical, support services, administration, and more!
Download a copy of the DCDH Employment Flyer to share with your extended network. View current job opportunities with Northern Health.
Construction camera
Curious to see what progress is being made on the construction of the new hospital? Check out the DCDH Construction Camera.
Any day, any time you can see a live snapshot, zoom in and out and side to side, compare photos from different days, go back in time for archived snapshots, and view monthly timelapses.
Interested in learning more?
Visit Let’s Talk DCDH
The Dawson Creek & District Hospital Replacement Project’s Let’s Talk site is our one-stop shop for everything related to the project. On the site, you can find:
- Key details and important information
- Regular project updates
- Draft renderings
- Photos of construction progress
- Engagement highlights
- Downloadable resources
Here are some stories, photos, videos and documents that have been shared recently:
- Over 300 jobs anticipated; locals already involved in the project
- More concrete pours and winter weather preparation
- Employment opportunities with Northern Health at the DCDH
- Display at Northern Lights College's Open House
- Timelapse: Construction camera (October)
- What's going to happen to the current DCDH?
- List of local and regional businesses - As of November 21, 2023 (PDF)
- Tower crane #2 installed
- Monthly labour report - As of November 30 2023 (PDF)
- Timelapse: Construction camera (November)
- Infographic: Comparison between current vs. new DCDH
- Photo: View from tower crane 1
- Monthly labour report - As of December 31 2023 (PDF)
- Timelapse: Construction camera (December)
- Photo: View from tower crane 2
- Ground heating and new temperature monitoring system
- DCDH ranked #92 on 2024 Top100 Projects
By registering for Let’s Talk DCDH, you can share your thoughts on the project by commenting on recent stories or you can ask questions directly to the project team through the Q&A tool.
Contact us directly
Reach out to Ashley Pannozzo, our Community Engagement Liaison Officer, for the Dawson Creek and District Hospital Replacement Project at LetsTalkDCDH@northernhealth.ca.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
DCDH ranked #92 on 2024 Top100 Projects
Share DCDH ranked #92 on 2024 Top100 Projects on Facebook Share DCDH ranked #92 on 2024 Top100 Projects on Twitter Share DCDH ranked #92 on 2024 Top100 Projects on Linkedin Email DCDH ranked #92 on 2024 Top100 Projects linkWith an investment value of approximately $590 million, the DCDH project is ranked #92 on the list of the top 100 biggest infrastructure projects in the country.
The 2024 Top100 Canada's Biggest Infrastructure Projects Report is an annual report published by ReNew Canada, an infrastructure magazine that ranks and profiles the country’s largest public infrastructure projects.
Upon completion, the new hospital will be more than 25% bigger than the current facility – strengthening existing services and supporting increased access to care for all Northeast residents.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
Ground heating and new temperature monitoring system
Share Ground heating and new temperature monitoring system on Facebook Share Ground heating and new temperature monitoring system on Twitter Share Ground heating and new temperature monitoring system on Linkedin Email Ground heating and new temperature monitoring system linkGraham Design Builders prepared for the winter months by implementing their frost protection plan to maintain temperature levels of the foundation subgrade, thereby allowing concrete work to continue through the winter and protecting the ground from frost. This included procuring and installing ground thaw machines and natural gas lines.
Graham has sourced a new-to-market temperature monitoring system to complement the ground thaw machines. The new system provides real-time temperatures of the subgrade to their cellular devices and allows them to turn down or shut off the heaters when they’re not needed. It also ensures compliance, reduces costs, and helps the environment.
Graham has taken a different approach to ground heating with the use of natural gas instead of diesel. Natural gas is more reliable, cleaner to run, eliminates greenhouse gas emissions from regular fuel deliveries, and reduces the amount of greenhouse gas producing fuel being used. Diesel units can have limitations, be prone to mechanical issues in colder weather, and typically run for shorter periods of time to remove frost as opposed to preventing it.
Typically, a ground thaw machine is supplied and installed as a single all-in-one unit. Graham acquired a system that was installed as individual units that work in unison to run cleaner and limit potential re-work or replacement. Individual units also keep a consistent heat to the multiple lines to prevent frost and reduce the volume of glycol that would typically be lost in the event of a line failure.
How does the ground thaw system work?
- There are five individual glycol boilers, and each boiler is 1.8 million BTU.
- The boiler heats the glycol and supplies a fluid exchanger pump with a 2-inch supply and 2-inch return line – which is the main heating element of the system.
- The hot glycol runs through the plate exchanger and back to the heating unit.
- The use of the fluid exchanger pump keeps the fluid from the heating unit separate from the fluid in the field.
- From the fluid exchanger pump, 2-inch supply and return hoses are connected to 2-10 port manifolds.
- From the manifolds, soft ¾-inch glycol lines are connected and run for a maximum length of 1,000 feet.
- This creates a full system where the glycol is pumped from the heating unit to the fluid exchanger pump, which then heats the glycol that’s circulating through the ¾ hose and manifolds therefore resulting in warm, frost-free ground.
How does the new temperature monitoring system work?
-
The temperature sensors are placed strategically throughout the site and at various depths.
- The depths are chosen based on the depth of the footings – some are placed at the bottom, some in the middle, and some shallow.
- A cellular enabled control node collects data at a set frequency (ex: 15 minutes) and then the information is sent to the Cloud where Graham can access the data.
- From the control node, there is an expansion box that can be hooked up to six temperature sensors.
- The system also notifies Graham automatically if/when temperatures drop below a certain set threshold.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
Slowing down for the holidays
Share Slowing down for the holidays on Facebook Share Slowing down for the holidays on Twitter Share Slowing down for the holidays on Linkedin Email Slowing down for the holidays linkThe holidays are just around the corner and everyone deserves a little break!
Our project team members are taking some much needed time off after a busy year of major milestones. They'll be spending time with their families, celebrating the holidays, and re-charging for the new year - and we hope you get to do the same! Work on site will also slow down between December 22 and January 2.
We wish you and your loved ones a happy and healthy holiday season and new year!
Stay tuned for more updates on the DCDH Project in 2024!
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
Infographic: Comparison between current vs. new DCDH
Share Infographic: Comparison between current vs. new DCDH on Facebook Share Infographic: Comparison between current vs. new DCDH on Twitter Share Infographic: Comparison between current vs. new DCDH on Linkedin Email Infographic: Comparison between current vs. new DCDH linkInterested in learning more about what the current Dawson Creek & District Hospital has in comparison to what the new hospital will have? Check out this infographic that compares the facility sizes, treatment spaces, programming and services, inpatient beds, and parking spaces!
Download a copy of the infographic to share with your family, friends, and extended network.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
Tower crane #2 installed
Share Tower crane #2 installed on Facebook Share Tower crane #2 installed on Twitter Share Tower crane #2 installed on Linkedin Email Tower crane #2 installed linkThere's been a new addition to the Dawson Creek skyline with the installation of the second tower crane.
Check out this timelapse video of the installation process.
Read more about the first tower crane and the important role that cranes play on construction sites.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
What's going to happen to the current DCDH?
Share What's going to happen to the current DCDH? on Facebook Share What's going to happen to the current DCDH? on Twitter Share What's going to happen to the current DCDH? on Linkedin Email What's going to happen to the current DCDH? linkMany residents have been wondering what will happen to the current Dawson Creek & District Hospital (DCDH) once the new hospital opens.
Health care services will continue to be delivered at the current hospital while construction is underway on the new hospital – which is expected to be open, operational and ready for patients in 2027.
Now, why are we building a new hospital instead of redeveloping the current one?
The current DCDH was built in 1960 in accordance with clinical health care services and building code standards at the time. Since then, standards have continuously evolved and improved.
Recognizing these changes, the current hospital doesn’t align with current clinical and patient care standards and doesn’t comply with the current BC Building Code. These factors have an impact on patient and family experiences and the delivery of quality and efficient care.
There’s also more than what meets the eye when it comes to older buildings like the current DCDH. The infrastructure may appear to be in good standing, but it’s what you can’t see that contributes significantly to the need to replace the facility. The current facility has a poor Facility Condition Index, and its age causes deficiencies such as capacity constraints and functional issues.
The new hospital is going to be a brand-new state-of-the-art facility that is built in compliance with national clinical and patient care standards as well as current design and construction codes.
Northern Health will continue to upgrade equipment and assets in the current hospital to ensure that we’re providing quality health care. A significant amount of the newer equipment and assets that are in good working order will be moved into the new facility during the transition process.
We also acknowledge the tremendous community support over the past years through the Dawson Creek Hospital Foundation to support the purchasing of equipment required to provide health care services within the community.
Once the new hospital is open and operational, the current hospital will become inactive, be emptied out and then removed. The site will be cleared and turned back into developable land for future use.
We recognize that the DCDH has played a significant role in the lives of many residents over the past 60+ years. There are ample memories and stories to be shared about the current hospital and there will opportunities for you to share those with us in the future. Stay tuned for more information!
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
Display at Northern Lights College's Open House
Share Display at Northern Lights College's Open House on Facebook Share Display at Northern Lights College's Open House on Twitter Share Display at Northern Lights College's Open House on Linkedin Email Display at Northern Lights College's Open House linkOn Saturday, November 4, Northern Lights College hosted an Open House at their Dawson Creek campus for community members to tour the campus and learn about programs.
Ashley Pannozzo, our Community Engagement Liaison was invited to represent Northern Health and set up a display in the Health Sciences Building. Attendees learned about the DCDH Project, employment opportunities with the current and future hospital, health care career opportunities with Northern Health, pathways into healthcare, and the Grow Our Own program.
The display included the project's fact sheet, employment flyer, draft renderings, sample materials and finishes palettes, and mini shovels!
Did you know? NLC offers a variety of health and human services programs that could help kickstart your journey in health care.
Interested in starting your journey with Northern Health at the newest hospital in the Northeast? There are a number of employment opportunities that need to be filled at the current and future Dawson Creek & District Hospital. Northern Health is also hiring for other positions in the community and across the region. To see all current job postings and apply online, visit http://jobs.northernhealth.ca/.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
Employment opportunities with Northern Health at the current and future DCDH
Share Employment opportunities with Northern Health at the current and future DCDH on Facebook Share Employment opportunities with Northern Health at the current and future DCDH on Twitter Share Employment opportunities with Northern Health at the current and future DCDH on Linkedin Email Employment opportunities with Northern Health at the current and future DCDH linkDownload a copy of the DCDH Employment Flyer to share with friends, family or colleagues.
There are a number of positions that need to be filled at the current and future Dawson Creek & District Hospital including:
- Care Aide
- Cook
- Diagnostics Imaging Technologist
- Dietitian
- Facility and Maintenance Worker
- Food Services Worker
- Health Information Professional
- Housekeeper
- Imaging Technician
- Indigenous Patient Health Assistant
- Laboratory Clerk
- Licensed Practical Nurse
- Medical Laboratory Clerk & Technologist
- Mental Health Clinician & Staff
- Nursing Unit Clerk
- Occupational & Physio Therapist
- Patient Reception Staff
- Pharmacist & Pharmacy Staff
- Physician
- Registered Nurse
- Registration Clerk
- Respiratory Therapist
- Social Worker
- Stores Attendant
Key contacts for opportunities at the new Dawson Creek & District Hospital:
Northern Health Staff Recruitment
Note: Please do not use this email to submit your resume. Instead, apply online via one of the links below.
Physician Recruitment
Daphne Savoy
Northeast Physician Recruiter
Daphne.Savoy@northernhealth.ca
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
-
More concrete pours and winter weather preparation
Share More concrete pours and winter weather preparation on Facebook Share More concrete pours and winter weather preparation on Twitter Share More concrete pours and winter weather preparation on Linkedin Email More concrete pours and winter weather preparation linkIf you’ve driven or walked by the site of the new hospital recently, you might have seen a sea of vibrant orange tarps across the site. Graham is planning and preparing for the winter months and starting to implement their frost protection plan.
It’s fundamental that heat and moisture control is addressed throughout the construction process during the winter months. This includes controlling the temperature and protecting the concrete foundations to avoid a negative impact on the quality of the installation and possible re-work, if not done correctly.
One of the biggest risks during the winter is the frost impact to the deep foundations. Planning and executing the plan has already started and will be an ongoing effort throughout winter. This includes:
- Installing and managing over 800 – 12x24 insulated tarps
-
Procuring and installing five 1.8m BTU glycol ground thaw machines that provide heat to over 80,000 lineal feet of glycol lines
- The glycol lines are spread throughout the foundation subgrade to maintain temperature levels
-
Installing a 30-pound natural gas line to the site with a 5-pound distribution centre to 12 locations across the site footprint
- This ensures there is a fuel supply to any location that heat is required for frost protection
- It also supports concrete pours throughout the winter
-
Elevating stored materials to ensure they don’t freeze into the ground
- Materials are marked so they know what it is and where it is, in the case of heavy snowfall
Safety of the people working on or visiting the construction site remains a priority. Winter weather creates different challenges and risks that have to be eliminated and controlled, and colder temperatures and snowfall changes how work is done on site.
Special equipment, tools, and materials are procured in preparation for the winter weather including snow shovels, ice melt, sand or rock chips, and skid steer attachments. Snow clearing is completed before shift start to limit interaction with the public and construction personnel. Workers are constantly clearing snow, removing ice, working on safe access over tarps, moving heaters and glycol lines, setting up hoardings and running extension cords.
The amount of planning hours and labor-intensive work that goes into preparing the site for winter helps ensure that workers and visitors can safely gain access to the construction site and work safely at all times.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends