Category Construction   Show all

  • Mock-up #3 in the Quonset hut

    Share Mock-up #3 in the Quonset hut on Facebook Share Mock-up #3 in the Quonset hut on Twitter Share Mock-up #3 in the Quonset hut on Linkedin Email Mock-up #3 in the Quonset hut link
    supporting image

    Last week, Graham Design Builders LP submitted the 95% design and hosted the third round of mock-ups inside the Quonset hut.

    Read more about ‘what’s inside the Quonset hut’.

    Mock-up #3 consisted of a fully constructed bariatric inpatient bedroom and washroom and isolation room and anteroom. These rooms included sample materials and finishes, millwork locations, key pieces of equipment, IMIT device and power receptacle locations, and furniture. Leadership representatives were able to experience key features of the design, provide feedback and input, and make design decisions.

    In addition to the constructed rooms, they reviewed window blinds, the layout of a medication room and the layout of the LDRP washroom and birthing tub.

    Mock-up #4 will be a prototype of an inpatient bedroom and washroom and bariatric room which will include all materials, services, millwork, finishes, equipment and furniture. It’ll be constructed in its actual location within the new facility and reviewed at various stages of construction.

    Photos from inside the isolation room and anteroom

    Photos from inside the bariatric inpatient room and washroom

    Photos from inside the medication room

    Photos from inside the LDRP washroom with the birthing tub

    Photo of the window blinds review

    Mock-up #4 will be executed later this year and will be an in-situ prototype of an inpatient bedroom and washroom and bariatric room. Clinical users will be able to review the prototype room including all materials, services, millwork, finishes, equipment and furniture in its actual location within the facility at various stages of construction.

    You need to be signed in to add your comment.