New sidewalk and temporary parking lot

A new sidewalk has been built and work is underway for a new temporary parking lot on the southwest corner of Northern Lights College’s campus.

Graham has been collaborating with NLC on the site logistics plan and identified the need for additional parking for workers to reduce the amount of parked vehicles around the site. NLC reached an agreement with Graham to allow them to use the vacant corner of their campus property for a temporary parking lot with over 200 parking stalls.

With winter quickly approaching, a safe walking path is also needed for workers to get from their vehicles in the lot to the construction site. As a thank-you to NLC and the City of Dawson Creek for their ongoing collaboration and hard work, Graham built a new sidewalk along 12 St. from 116 Ave to NLC's access road. Workers on site, students at NLC and local residents can now all enjoy the new sidewalk which makes walking around the area that much easier and safer!

Categories: Construction Progress, Photos
Share New sidewalk and temporary parking lot on Facebook Share New sidewalk and temporary parking lot on Twitter Share New sidewalk and temporary parking lot on Linkedin Email New sidewalk and temporary parking lot link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>