You need to be signed in to add your comment.

March Progress Pictures

You've seen how exterior construction has progressed thanks to the time-lapse video we shared last month, but what's going on inside the new Stuart Lake Hospital? The team from Graham took us on a site tour this week to see how it's all coming together.

Keep scrolling for a look inside the new facility!


Welcome to the entrance of the new Stuart Lake Hospital! Natural light is a priority to ensure the new space is as bright and inviting as possible. You'll find floor-to-ceiling windows walking in and sky-high ceilings in the main reception lobby.

The new site will move health services under one roof. Above is a sneak peek at the new Primary Care areas (left: reception and waiting area, right: patient room).

In Long-Term Care, we want to make sure the space is inviting for residents and their families. On the left, you'll see one of the spacious rooms (with a spectacular view of Mount Pope). On the right, the tour is scoping out the common areas, which will eventually become a living room/lounge area, dining room, and kitchen.

Even though construction has come a long way, there's still lots to do before opening! The Graham crew is hard at work making sure every detail is perfect. (Pictured right: the new Spiritual Space begins to take form. Top left: crews building the long-term care nursing station. Bottom left: Graham project manager Drew sharing plans with HSA Megan from Northern Health)

We can't wait to welcome the community into the new Stuart Lake Hospital in 2025. Until then, check back for project updates and let us know what you're most excited for in the comments!

Categories: Construction, Design, Photos, Progress
Share March Progress Pictures on Facebook Share March Progress Pictures on Twitter Share March Progress Pictures on Linkedin Email March Progress Pictures link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>